The National Aquatic Centre is one of Europe’s largest indoor water sports facilities. The facilities main event is a ten lane 50m by 25m international standard swimming pool with two moveable floors which allow reconfiguration for multiple uses. Concast provided all Precast terraced seating units for 2,500 spectators located on either side of the main […]
Green Reit PLC instructed BAM to design and build One Molesworth Street, a high-end office building with ground floor retail at a premier address within Dublin’s Central Business District. The accommodation incorporates offices of 6,600 sqm, 2,100 sqm of retail and 27 basement car spaces accessed via two car lifts. BAM choose a steel frame […]
Concast provided two substantial seven storey Precast access cores for a new multi-storey car park (MSCP) at SKY Corporation’s new Head Quarters at Osterley London. The cores form part of a large MSCP which was designed in steel by Concast’s client Bourne Parking. Both cores were constructed utilising two Concast erection crews and two mobile […]
Concast have successfully completed five independent Precast access cores at Penrose Quay Cork for main contractor PJ Hegarty and developer JCD. The overall project provides office accommodation totalling 250,000 sqm with stair and lift access provided by Concast cores servicing 11 floors including two basement levels. Generous floor to ceiling heights within the office accommodation […]
Main contractor McLaren were instructed by joint developers Roxhill and Port of Tilbury to provide a mega-shed complex for Amazon at Tilbury including a 22m high-bay warehouse with over 185,000 sqm of internal floor space and an adjacent 1,700 space multi-storey car park (MSCP) to cater for the staff of 3,900 shift workers. This substantial […]
Main contractor McLaren completed a new 87,000 sqm national distribution centre for developer Gazeley at Magna Park Milton Keynes. Occupied by Waitrose, the building represents one of the larger distribution centres in the UK, constructed by McLaren in a record 32 week programme. Concast are proud to have been part of such a major programme […]
Winvic were instructed by developer Mountpark to construct two adjoining distribution warehouses at Bardon Leicester. Unit 1 is a 93,000 sqm Amazon Fulfillment Centre with 80 dock levellers while Unit 2 is a smaller 28,000 sqm Eddie Stobart distribution warehouse with 36 dock levellers. Concast provided all 116 Precast dock levellers along with; insulated sandwich […]
Joint venture partners Roxhill and Segro appointed main contractor Winvic to complete this “Super Hub” building for distribution company Hermes. The unit comprises a 25,000 sqm distribution warehouse with a cross-docking system located adjacent the M6 motorway. Concast supplied and erected 178 Precast dock levellers along with; ancillary service yard walls; insulated sandwich panel surrounds […]
Costco, one of the world’s largest retailers, has a strong relationship with Sheffield based main contractor JF Finnegan who have completed numerous large scale Costco projects across England. The Crick project comprised a distribution warehouse of approximately 35,000 sqm with the Precast package including; 210 Costco designed dock levellers forming a cross-docking system; ground beams; […]
Huntingdon District Council instructed main contractor Graham to design and build a 406 space multi-storey car park (MSCP) within the grounds of existing surface car parking and town centre shopping. As the existing access to the supermarket surface car park and an adjoining petrol station had to be maintained throughout construction, Graham choose a Precast […]
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Cookies Policy
Privacy Overview
This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.