Tag

Sample Project

Copland’s Dock Orkney Island Scotland

/ / / / /
The Copland’s Dock pier forms part of Orkney Council’s investment in major infrastructure projects for the marine renewables industry. BAM Nuttall choose Concast to provide a Precast solution for the new pier deck. Concast provided Precast weighing over 5,200T comprising 879 separate elements delivered in two chartered shipments. A total of 29T of bracing steel […]

Hermes Rugby Gateway Rugby

/ / / / / /
Joint venture partners Roxhill and Segro appointed main contractor Winvic to complete this “Super Hub” building for distribution company Hermes. The unit comprises a 25,000 sqm distribution warehouse with a cross-docking system located adjacent the M6 motorway. Concast supplied and erected 178 Precast dock levellers along with; ancillary service yard walls; insulated sandwich panel surrounds […]

Huntingdon Town Centre Cambridge

/ / / / / / / /
Huntingdon District Council instructed main contractor Graham to design and build a 406 space multi-storey car park (MSCP) within the grounds of existing surface car parking and town centre shopping. As the existing access to the supermarket surface car park and an adjoining petrol station had to be maintained throughout construction, Graham choose a Precast […]

HIX Holiday Inn Express Birmingham

/ / / /
Sisk instructed Concast to provide a Precast frame solution for this impressive 17 storey 250 bedroom hotel, located in the heart of Birmingham City Centre. The ground, first and second floor levels were constructed in steel and insitu concrete creating a transfer deck at level two, with the entire frame for floors 3-17 constructed with […]