Tag

Accommodation

Deaconess House Student Residence Edinburgh

/ / / / / / /
Joint developers MACE and Edinburgh University instructed main contractor Graham to redevelop the former NHS Lothian headquarters to provide 318 student bed spaces set out in both studio and cluster accommodation. This high profile project required the retention of the former hospital’s Victorian exterior along with the construction of three 3-5 storey new-build blocks arranged […]

Bridgewater Shopping Centre Wicklow

/ / / / / / / /
The Bridgewater Shopping Centre comprises a large regional shopping complex, apartments, offices and an adjoining six screen cinema. Concast provided a Precast frame totalling approximately 12,000 sqm. fronting the Arklow River while the majority of the single storey shopping accommodation was constructed to the rear utilising a steel frame. The Precast frame comprised dual frontages […]

Royal Canal Park Dublin

/ / / / / / / / / /
Royal Canal Park is a substantial Dublin City residential scheme located a short distance east of Dublin’s Phoenix Park. Developer Ballymore Homes instructed Concast to complete both Phase 1 and Phase 2 utilising a total Precast frame solution to construct approximately 950 residential units and approximately 4,000 sqm of commercial including retail, office and leisure […]

The Grange Stillorgan Dublin

/ / / / / /
Concast provided a full Precast cross wall frame solution for developer / main contractor Glenkerrin Homes at the The Grange, a prestigious mixed use apartment and commercial project on 4.6 hectares in Dublin’s southside. Concast provided seven separate apartment buildings incorporating 502 high specification apartments with building heights ranging from six to ten storeys in […]

HIX Holiday Inn Express Birmingham

/ / / /
Sisk instructed Concast to provide a Precast frame solution for this impressive 17 storey 250 bedroom hotel, located in the heart of Birmingham City Centre. The ground, first and second floor levels were constructed in steel and insitu concrete creating a transfer deck at level two, with the entire frame for floors 3-17 constructed with […]