Hybrid Structure

One Molesworth Street Dublin

/ / /
Green Reit PLC instructed BAM to design and build One Molesworth Street, a high-end office building with ground floor retail at a premier address within Dublin’s Central Business District. The accommodation incorporates offices of 6,600 sqm, 2,100 sqm of retail and 27 basement car spaces accessed via two car lifts. BAM choose a steel frame […]

BSKYB HQ Osterley London

/ / / /
Concast provided two substantial seven storey Precast access cores for a new multi-storey car park (MSCP) at SKY Corporation’s new Head Quarters at Osterley London. The cores form part of a large MSCP which was designed in steel by Concast’s client Bourne Parking. Both cores were constructed utilising two Concast erection crews and two mobile […]

Penrose Dock Cork

/ / / /
Concast have successfully completed five independent Precast access cores at Penrose Quay Cork for main contractor PJ Hegarty and developer JCD. The overall project provides office accommodation totalling 250,000 sqm with stair and lift access provided by Concast cores servicing 11 floors including two basement levels. Generous floor to ceiling heights within the office accommodation […]

Amazon Tilbury London

/ / / /
Main contractor McLaren were instructed by joint developers Roxhill and Port of Tilbury to provide a mega-shed complex for Amazon at Tilbury including a 22m high-bay warehouse with over 185,000 sqm of internal floor space and an adjacent 1,700 space multi-storey car park (MSCP) to cater for the staff of 3,900 shift workers. This substantial […]

Dublin International Airport Terminal 2

/ / / / /
Dublin Airport Authority (DAA) instructed Balfour Beatty to complete the extension of the existing Precast multi-storey car park at Terminal 2 Dublin Airport. The extension provides an additional four floors above an existing two storey Precast car park, increasing capacity by an additional 1,300 spaces. Determined by cranage limitations, Balfour Beatty choose to construct the […]

City Gate Park Cork

/ / / / / / /
BAM were instructed by developer JCD to construct City Gate Park comprising three separate office buildings totalling 29,000 sqm of office accommodation and 600 car spaces in a double basement. BAM choose to design the four and five storey buildings in structural steel with Precast access cores over a Precast double basement multi-storey car park. […]