Tag

Warehouse

Amazon Tilbury London

/ / / /
Main contractor McLaren were instructed by joint developers Roxhill and Port of Tilbury to provide a mega-shed complex for Amazon at Tilbury including a 22m high-bay warehouse with over 185,000 sqm of internal floor space and an adjacent 1,700 space multi-storey car park (MSCP) to cater for the staff of 3,900 shift workers. This substantial […]

Waitrose Magna Park Milton Keynes

/ / / /
Main contractor McLaren completed a new 87,000 sqm national distribution centre for developer Gazeley at Magna Park Milton Keynes. Occupied by Waitrose, the building represents one of the larger distribution centres in the UK, constructed by McLaren in a record 32 week programme. Concast are proud to have been part of such a major programme […]

Amazon Bardon Leicester

/ / / /
Winvic were instructed by developer Mountpark to construct two adjoining distribution warehouses at Bardon Leicester. Unit 1 is a 93,000 sqm Amazon Fulfillment Centre with 80 dock levellers while Unit 2 is a smaller 28,000 sqm Eddie Stobart distribution warehouse with 36 dock levellers. Concast provided all 116 Precast dock levellers along with; insulated sandwich […]

Hermes Rugby Gateway Rugby

/ / / / / /
Joint venture partners Roxhill and Segro appointed main contractor Winvic to complete this “Super Hub” building for distribution company Hermes. The unit comprises a 25,000 sqm distribution warehouse with a cross-docking system located adjacent the M6 motorway. Concast supplied and erected 178 Precast dock levellers along with; ancillary service yard walls; insulated sandwich panel surrounds […]

Costco Crick Northampton

/ / / / /
Costco, one of the world’s largest retailers, has a strong relationship with Sheffield based main contractor JF Finnegan who have completed numerous large scale Costco projects across England. The Crick project comprised a distribution warehouse of approximately 35,000 sqm with the Precast package including; 210 Costco designed dock levellers forming a cross-docking system; ground beams; […]

Amazon Tilbury London

/ / / / / /
Main contractor McLaren were instructed by joint developers Roxhill and Port of Tilbury to provide a mega-shed complex for Amazon at Tilbury. The complex includes a 22m high-bay warehouse with nearly 200,000 sqm of internal floor space and an adjacent 1,700 space multi-storey car park (MSCP) to cater for the staff of 3,900 shift workers. […]

Nutgrove Retail Park Dublin

/ / / / / / / / / /
Concast provided a total Precast frame solution at Nutgrove Retail Park comprising 21,000 sqm of office, retail and retail warehouse accommodation above a 450 space basement car park. In designing the large open plan retail warehouse units we utilised a C4 pitched roof beam combined with multi-story columns. Our C4 beam can span up to […]

Asda Middleton Rochdale

/ / / /
This project at Kingsway Business Park Rochdale was completed during 2012 with McLaren appointed as main contractor by developer and end user Asda. The project comprised a 50,000 sqm distribution center providing ambient, chilled and freezer storage areas. With sustainability a priority for client Asda the project achieved a BREEAM “Excellent” and “A” energy performance […]

Chemco Ballycoolin Dublin

/ / /
This project comprised the manufacture and install of a 2,300 sqm ten bay warehouse for MDY Construction at Stadium Business Park Ballycoolin Dublin. The developer / occupier Chemco (Ireland) are a chemical supplier who specified a Precast solution due to its inherent fire rating, long life, low maintenance, robust, dust and ledge free properties. Concast’s […]